|
|||||||||
Miscellaneous Driveway-Pipe Requirements All new driveways which ingress/egress from a county road or private mini-road must be inspected by DPW in order to determine the need for a pipe,and to verify any "line of sight/sight distance" considerations for vehicular safety. For parcels requiring a pipe, the applicant/owner will be responsible for the installation of the pipe. The applicant/owner will sign an agreement indicating that the pipe will be installed to the county specification prior to occupancy or use. Storm Water Management Permit Review Procedure All permit applications require a stormwater review. With the December 31, 2004 codified expiry, all residential lots of record and lots which were approved under the prior (pre-July 31, 2001) stormwater management ordinance criteria must address the current Cecil County Stormwater Management Ordinance. Agricultural projects detailed in a Soil and Water Quality Conservation Plan and approved by the Cecil Soil Conservation District MAY be exempt. Any construction exceeding the 5,000 square feet in disturbance will require a stormwater management submittal and/or plan. It is the responsibility of the applicant to provide proof of any existing plan to the approving agencies. Building (Grading) Permit Processing through the Department of Soil Conservation The Department of Soil Conservation is found within the Cecil Soil Conservation District (CSCD), at 105 Chesapeake Blvd., Suite B-3, Elkton, MD 21921. Telephone: 410.398.4411, ext. 3. The applicant must submit an Erosion and Sediment Control Plan to the CSCD for review and approval in all instances where a grading permit is required. Stormwater Management--Small Pond Requirements The applicant must submit all Stormwater Management Plans (for Small Pond Approval only) to the CSCD for review and approval in all instances where the engineered plan includes a Basin. The pond information will be reviewed to make sure that the plan meets the Maryland 378 Pond Standards when applicable. The CSCD will notify the Dept. of Public Works after Small Pond Approval is granted to circulate the SWM plans for the required signatures by both departments. |
|||||||||